Holborn, South Shields – Case Study
Preparing a 9ha former dockyard site on the south bank of the River Tyne for mixed-used development; including marine civils, demolition, bulk earthworks and land...
Preparing a 9ha former dockyard site on the south bank of the River Tyne for mixed-used development; including marine civils, demolition, bulk earthworks and land...
Site preparation, remediation and infrastructure of 10 hectares of former industrial land, including former gas works, printing and dye works.
Stabilisation of former coal workings and engineered platform creation for 44-acre commercial redevelopment.
The 150-acre former Stanton Iron Works brownfield will be transformed into a Midlands distribution hub with a dedicated rail hub.
Deep earthworks, re-engineering and reuse of site-won materials at scale, void treatment, and ground preparation for a 2,300-home mixed-use development.
SEGRO (EASTPLUS) Trading Ltd is a leading UK REIT specialising in modern industrial properties. They are developing a 40,000 sq ft site in East London.
£10.2m remediation and civil engineering of a former Gasworks including the construction of a basement, 530m of contiguous piling and preparation of site infrastructure, including...
JFHR started remediation at Biggins Wood for Folkestone and Hythe Council, planning 660m² commercial space, 5,142m² industrial space, and 77 homes.
Historically, much of the 44 acre site was occupied by a foundry/iron works, evolving into an engineering works with chimneys, storage tanks, travelling cranes and...
The Ironbridge Power Station regeneration project - Harworth secured planning approval for the regeneration of the former Ironbridge Power Station in Shropshire.
Award winning £3.2m regeneration project encompassing demolition, remediation and formation of a new river channel, flood defence works, ecological formation and biodiversity enhancements
John F Hunt Regeneration was contracted in March 2022 by Pocket Living to complete a package of remediation and enabling works to prepare the site...
K19D was a fabrication area for Hinkley Point A, with structures, services, asbestos, and hydrocarbon-impacted soil. John F Hunt Regeneration worked on its investigation and...